This section shows some of the projects undertaken over the years. Teams are put together for the specific project requirement. Projects include fairing and painting, mast building, plug and mould tooling.  The scope of works has often included the setup of the workshop facility prior to commencement of the project. The project duration can be from a few weeks to more than one year. Tony has been happy to incorporate and train the client’s staff to work alongside his specialists.

MALTESE FALCON YARD ARMS PLUG & MOULD

Picture

SCOPE OF WORK

Build plug and split female mould tool suitable for high pressure bladder moulding of yard arms. Design build method and finish two prototype booms.

On completion of our works in Brightlingsea the mould tools were shipped to Tuzla in Turkey where Magma's staff completed a further 16 yard arms.
​

The two prototype yard arms are still in use on Maltese Falcon today.
CLIENT
YEAR
DURATION
​LOCATION
Magma Structures
2004
6 Months
Brightlingsea, Essex, UK
GALLERY

60 METRE FREE STANDING AERO RIG

Picture

SCOPE OF WORK

Following the failure of the original contractor the assets were bought for set up in Amsterdam.

​A first class facility was established for purpose.
​ 
 
The completed mast has now achieved many sea miles and remains in perfect condition. 
CLIENT
YEAR
DURATION
LOCATION

Owner 
2005 
14 Months 
Amsterdam, Netherlands
GALLERY

THE ATLANTIC - CLASSIC THREE MASTED SCHOONER FAIR & PAINT

Picture

SCOPE OF WORK

Full fair and painting whilst in the water!

​Awl Grip products
 were used through out.  
​              
       
At 56 metres Atlantic must be one of the most beautiful of all the classics!
CLIENT
YEAR
DURATION
LOCATION
Owner
2010
7 Months
​Zwijndrecht
, Netherlands
GALLERY

 SAILING YACHT A - 1/9TH SCALE TEST MAST FOR 98 METRE FREE STANDING MAST

Picture

SCOPE OF WORK

Complete 1/9th scale mast to drawings supplied.
Carry out all works including the c
ommissioning of CNC machined Styrofoam mould tools, all carbon laminate, paint finish and fit out. Before joining the two halves of the split moulding they were fitted with fibre optic strain gauges for load testing. 
 
​
At 1/9th scale still over 10 metres!
CLIENT
YEAR
DURATION
​LOCATION
Magma Structures 
2012 
9 Weeks
Ipswich, UK
GALLERY

MPC 28 MULTIPURPOSE CATARMARAN PLUG & MOULD

Picture

SCOPE OF WORK

Commission new workshop facility. Determine build methods.
Build Plug and mould tool. LOA 28 metres.

Train and lead Coastal Marine staff
to work within team.

Achieve DNV workshop practice classification status.
CLIENT
YEAR
DURATION
LOCATION
Coastal Marine Ltd
2013
6 Months
Eyemouth, Scotland
GALLERY

MPC 22 MULTIPURPOSE CATARMARAN PLUG & MOULD

Picture

SCOPE OF WORK

Cut and extend existing plug, re fair and paint. Build GRP mould tool. LOA 22 metres.
CLIENT
YEAR
DURATION
LOCATION
CTruk Ltd 
​
2014 
7 Weeks 
Colchester,UK
GALLERY